“Gazela” Bridge & “Mostar” Interchange
In the reconstruction of the “Gazela” bridge and the “Mostar” interchange, the “Eliminator” waterproofing system was used, 2-layer concrete construction, hard-cast asphalt […]
In the reconstruction of the “Gazela” bridge and the “Mostar” interchange, the “Eliminator” waterproofing system was used, 2-layer concrete construction, hard-cast asphalt […]
We are pleased to announce that our team at Neshvyl has successfully completed the installation of GCP’s Eliminator waterproofing system on the […]
Reservoirs for water for orchard irrigation, Ponds, Eco swimming pools, Diversion of river flows, Construction of watertight barrier in drainage channels at […]