In the reconstruction of the “Gazela” bridge and the “Mostar” interchange, the “Eliminator” waterproofing system was used, 2-layer concrete construction, hard-cast asphalt + SMA pavement, area 60,000m2; steel structure, pavement curtain hard-cast asphalt + SMA, surface area 11,000m2; on the footpaths, the Bridgemaster system was used on a concrete base as a waterproofing layer and an antislip surface with an area of 4,500m2; Bridgemaster on steel as a waterproofing layer and an antislip surface with an area of 3,500m2;